Moscow, www.at-consulting.ru
IT, System Integration, Internet... Show more
Business Consultant / Technical Consultant
The Yota project (http://www.yota.ru/ru/), August, 2012 – November, 2012
Role: Business/Technical Consultant
A large project focused on construction DW and reporting systems for Russian provider of mobile broadband services.
Responsibilities:
- design a DW architecture;
- integration with the following programs: CDI (the system that storage personal data of the clients),Orga (billing), Concept Wave (a hierarchical system for commercial products );
- development and implementing procedures to extract , transform and load data from different sources;
- preparation of all the necessary documentation.
The Rostelecom project (www.moscow.rt.ru/), May, 2011 – August, 2012
Role: Business Consultant
The goal of the project was to build DW for the Russia's largest telecommunications company and to create an operational, administrative and mandatory reporting system.
Responsibilities:
- discussion and creating an architecture of data bases;
- correction of data extraction from source systems;
- analysis of data on the sources, reconciliation of data loaded , the coordination of the uploaded data;
- development of different algorithm for unloading and data transformation;
- construction of various report forms;
- preparation of all necessary documentation ( functional requirements , technical requirements and specifications);
- creating and presenting a product to the client.
The VimpelCom / Beeline project (www.beeline.ru), October, 2010 – May, 2011
Role: Technical Consultant
Participation in the DW project as a consultant
Responsibilities:
Repairing on possible defects occured in system:
-level program code and / or database structure ,
-linking to the optimization of the system;
Searching for workarounds (workaround) to isolate the problem;
Participation in the decision of incidents in the provision of advice:
- refinement algorithms functionalities (development and implementation),
- consultation on algorithms conversion information for reports ;
-support for up to date design documentation;
Collecting of date to date reports.